Archives!



Uffici e Centro Logistico Detectalia
21 March /

DetectaliaTm’s Office and Logistic center

Detectalia Europe

Office and logistic center

Buildings

Details_

 

  • CLIENT: Detectalia Europe s.l.u.
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 900mq
  • BUDGET: 400.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed
  • Photografer: ©AdHocMsl

Project description_

 

The new Detectalia Europe‘s headquarters involves the construction of a building containing the offices and storages located in a  plot inside of an industrial estate in Alicante, Spain. Client’s request was to have building stands out from all other buildings within the industrial area. A Landmark , and icon capable to activate new business for the company.

Uffici e centro logistico Detectalia Europe

Our deign intention was to realize an industrial building that visually would break with the typical image of the surroundings and that would different from the  classical shed appeal usually based on pitched roof and facade dichotomy. A building that, thanks to its small size, it was more like a symbolic object to a real building itself. It would have been like a stone set in the ground similar to the characteristic rocky and barren land of the surrounding landscape.

Uffici e Centro Logistico Detectalia - Vista esterna
Uffici e centro logistico Detectalia Europe
Uffici e centro logistico Detectalia Europe

Because of the limited budget, we designed something feasible within economical constrains , avoiding any difficult or complicated solution, tiring to semplify the use of material and details.For this reason it was decided to start to work by using simple elements and of easy realization: a classic metal steel structure with pillars and pitched roof, clad with insulated aluminum panels covered in yellow polyurea on the top side and lacquered white on the bottom.

In collaboration with the engineering firm Maffeis Engineering S.p.A. and using a parametric modeling software we modified the trilithic structure in order to achieve the best balance between plastic form and dimensional and mechanical optimization of aforementioned structures.

Uffici e Centro Logistico Detectalia - Cantiere
Uffici e sede di Detectalia

The coating is intended to be a skin , which modify and change the concept of being an edge. The roof becomes a facade, and the facade within its tridimensional shape becomes a roof. The main building entrance, identified by a portal made of black metal sheet, is placed in the north side near to the industrial area’s main entrance. In the main lobby there is  a reception area with a well coming area, that connects the exhibition space in the ground floor.  The area dedicated to the  open-space offices on the first floor are connected by a steel custom made staircase.

Our research was not only focused on formal aspects, therefore we strongly believe in the need to design a landmark that would be ecologic and feasible at the same time. For that purpose in order to use spaces at best and to improve the energy efficiency of these, we decrease  the high in the office areas ( 6.00 m) and increase the one in the warehouse ( 9.00 m) favoring and exploiting the formless shapes of building .

Uffici e Centro Logistico Detectalia - Ingresso
Uffici e Centro Logistico Detectalia - Uffici
Uffici e centro logistico Detectalia Europe
Uffici e Centro Logistico Detectalia - Uffici
Uffici e centro logistico Detectalia Europe

Similar projects

Load more

Torri per uffici - Vista esterna
3 March /

Four buildings for offices

Main building of the PTFA

4 towers with offices, Conference Hall, Restaurant, Gymnasium and nursery

Interiors Design

Details_

 

  • CLIENT: Parque Tecnologico de Fuente Alamo – PTFA
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 10.000mq
  • BUDGET: 7.500.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | On the run
  • Photografer: ©AdHocMsl

Project description_

 

To paraphrase Pedro Almodóvar, the project could be called “Towers on the edge of an economic crisis” … The  project was born  in 2007 as a natural continuation of the victory of the competition organized by the Parque Tecnológico de Fuente Álamo in 2006 for the realization of the Centro de Desarrollo, Innovación y Negocio (Cedin), a building of about 10,000 square meters destined to offices for rent to small companies with high technological content and service functions to the activity of the park, such as a conference hall, training rooms, a gym, a restaurant / cafeteria and a kindergarten for the children in mainstream employees.

To exploit the maximum buildable surface area available, increasing the once would be considered as rentable, he thought to occupy at height of -4.50 m the entire plot  for all the auxiliary  functions and to squeeze and locate part of the offices ( about 6,000 square meters) in four towers elliptical base of 4, 6 and 8 floors.

Quattro torri per uffici
Torri per uffici - Vista esterna

Seen from the outside the Cedin complex results to be constituted by only four buildings rested on the ground, since we hide the private function in the basement.  A deformed cloverleaf “cut” the ground floor’s surface, and it generates four green patios , each surrounded  by the windows functions as  restaurant, gym, nursery,  and foyer of the conference hall – of which become natural continuation and external area transformed respectively in open-air terrace of the cafeteria, rest and relaxation area, playground area and outdoor receptions.

Torri per uffici - Il patio interrato
Torri per uffici - Il patio interrato
Torri per uffici - Il patio interrato
Torri per uffici - Il patio interrato

Thanks to the complete transparency of closing windows of these spaces, the ground floor slab turns out to be a thin surface which is opposed to the office tower. The plan typology characterized by  a oval rounded shape with a central core containing the block stairs / elevators and toilets, allows to best use the space for offices because it provides flexibility within the space.

Torri per uffici - Il patio interrato
Torri per uffici - Patio
Torri per uffici - Il patio interrato

The exterior facade, originally designed with triangular supporting structure and white lacquered aluminum and glass panels, was replaced for cost issue with a more traditional brick façade covered with Ondulit panels colored in different shades of gray .

Unfortunately, the economic crisis which occurred in Spain, caused the failure of Immobiliare who at the time was financing the project. Therefore the construction site has been suspended and abandoned  by the Contractor without completing the work.

Inside the building only the reinforced concrete structures are built. In regards the exterior Contractor completed the work till the insulation layer only

Torri per uffici - PIanta interrato

Similar projects

Load more

Impianto desalinizzazione acqua marina - Il percorso
1 March /

Sea’s water desalinization plant

Sea’s water desalinization plant in Almeria

Studio delle facciate, percorso informativo ed edifcio d'accoglienza

Buildings, Interiors Design

Details_

 

  • CLIENT: Programa A.G.U.A – AcuaMed
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 120.000sqm
  • BUDGET: 200.000.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed

Project description_

 

Within the program A.G.U.A. the Zapatero government,  we were commissioned  to design and be responsible for  architectural and landscaping integration of complex for the desalination of seawater. Client’s request was to convert the project to install a “transparent” system of information and communication of the industrial transformation process, since it was at that time very disputed and subject of many complaints from the population because it was wrongly considered to be reasonable of the increased pollution of the city.

Impianto desalinizzazione acqua marina - Il percorso

It was not only to “open the doors to the people” – which is actually something impossible since this type of system has a strictly restricted access – but also to create a path, totally independent and without interfering with daily activities, that it would freely used by anyone. The request was to have a new building that would representative of the new approach of the company becoming a new space for the citizenship.

As a Concept  we get inspiration from the foam, not only for his own relationship with the foam sea, however mostly because we were interested in its cellular structure as continuous aggregate of cells, connected spaces, fragile and constantly changing.

Impianto desalinizzazione acqua marina - Modello
Impianto desalinizzazione acqua marina
Impianto desalinizzazione acqua marina - Modello
Impianto desalinizzazione acqua marina - Modello

The foam concept led us to imagine a path similar to a wire grid structure “stretched” over the various buildings and warehouses that, thanks to its alternation of full and empty spaces, allowed to be viable and penetrated by the visitors and at the same time it could be the protagonist of the  different phases and components of the industrial process.A real “Water Route” where visitors could follow the path of water from sea water to drinking water, verifying personally the different stages of the process.

In this way the visitor has the chance to be directly in  contact with the industrial process that becomes the main actor of that amazing and exciting experience .Facilities as cafe’, restaurant, conference room , exhibition center, and small shop are displaced in the beginning of the exhibition path.

Impianto desalinizzazione acqua marina - Il processo d'osmosi
Impianto desalinizzazione acqua marina - Il percorso
Impianto desalinizzazione acqua marina - Il percorso
Impianto desalinizzazione acqua marina - Il percorso

Building’s roof is architecturally treated to be an artificial landscape. A place to be, and to stay as it would a public artificial garden, with children’s playground, a kiosk and fountains with water coming from the plant itself.

Unfortunately, due to the change of government, to the budget’s reductions  and its related  slowdown in the process, our design has undergone numerous and substantial changes in its final form.

Similar projects

Load more

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Beach Club La Manga - Piscina
1 March /

Beach Club La Manga

Beach Club in La Manga del Mar Menor

Private club. Lounge bar, restaurant and swimming pool

Buildings, Interiors Design

Details_

 

  • CLIENT: Grupo Collado
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 2.500sqm
  • BUDGET: 1.500.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed
  • PRIZES: 2009 – XV Premios de Arquitectura de la Región de Murcia | Honorable Mention
  • Photografer: © Riccardo Crespi

Project description_

 

The dome’s shape that identifies the Beach Club La Manga has always been a characteristic element of the dune landscape of land that separates the Mar Menor from the Mediterranean sea. It was the roof of a 2-storey beach villa belonged to one of the last ministers during Franco time. In the early 2000s the building was bought by the company Grupo Collado with the intention of renovating and to turn it into an attractive place.

After the first inspection, we immediately noticed that as not only the original interior spaces were absolutely anonymous and not reflecting the quality of the dome, but above the dome ‘s structure were impressively damage and compromised due to the  corrosive effects of seawater. Therefore we decided to act in two different directions: the first to demolish and to remove all the elements that could affect negatively the purity of dome’s shape, the second to remove  and replace completely dome’s  steel structure: a risky and complex action that has focused most of the time devoted to the construction site.

Beach Club La Manga
Beach Club La Manga - Vista esterna
Beach Club La Manga - Vista esterna
Beach Club La Manga - Vista esterna
Beach Club La Manga - Piscina

Once freed the original dome’s structure,  we built in the central area 3 different wooden volumes, containing the bar, the pool changing rooms and the restaurant kitchen. The upper floor space was dedicated to a full open sitting area and to a big outdoor terrace located in the perimeter of the building from which to admire the landscape through the dome’s opening.

Beach Club La Manga - Dettaglio cupola
Beach Club La Manga - Dettagli
Beach Club La Manga - La terrazza inferiore

An elliptical concrete staircase connects the two floors. A sliding glass door fully operable from both floors, enables the complete permeability and continuity between  interior and exterior spaces.  The above system makes creates flexible spaces and dissolves the boundaries between indoor and outdoor spaces. Aforementioned perception is more emphasized  during  summer time when it is be possible to keep the sliding door system open to create a unique flexible outdoor space that face the seaside.

Beach Club La Manga - Il ristorante
Beach Club La Manga - Il ristorante
Beach Club La Manga - La terrazza perimetrale

Similar projects

Load more