Archives!



Villa al mare a Fregene - Dopo
29 February /

House at the seaside

Beach villa in Fregene

Indoor and Outdoor Renovation

Buildings, Interiors Design

Details_

 

  • CLIENT: Latrofa 1959
  • PROJECT: Riccardo Crespi Architetto
  • AREA: 400mq
  • BUDGET: 400.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed
  • Photografer: © Riccardo Crespi

Project description_

 

Our scope of work regards the complete renovation of indoor  and outdoor space of a  beach Villa in the “Villaggio dei Pescatori” Compound in Fregene, a seaside town a few kilometers from Rome.

Only the volume and the main structure  have been preserved  of the original house, dating back to the early 60s. We modified radically the whole internal and external distribution, starting from the facade up to the veranda and garden. The external original red brick color has been replaced by a white painting, considered more elegant and suitable. All the closures are made of bent sheet metal and painted white. The terrace has been extended and the original veranda has been replaced with a wooden canopy with frame similar to the brise soleil type, that provide a pleasant shade on the front side during summertime becoming a pleasant place to be to relax, read a book or lunch with friends in spite of the summer heat. The garden, in a complete state of disrepair, has been cleaned up protecting only some native plants, leaving a large area dedicated simply to grass

All indoor  spaces have been completely transformed and redesigned. The main kitchen originally located near the main entrance, at the Ground floor level, has been moved in the back of the house. The above to create a unique big and flexible space used as a main living and dining room as well. In that area we displaced a big  steel cantilevered table , direct continuation of the stove, comfortably used as a table or kitchen worktop or even sitting, thanks to the 22 cm in difference between the FFL of the kitchen and the living room. Beside the kitchen, where previously the living room were placed,  there is a small guest room, equipped with private bathroom.

Villa al mare a Fregene - Dopo
Villa al mare a Fregene - Terrazza esterna
Villa al mare a Fregene - Terrazza esterna
Villa al mare a Fregene - Terrazza esterna
Villa al mare a Fregene - Esterno

The original spiral staircase has been replaced with a wooden staircase with cantilevered steps inserted into the wall. This alternative allows us to get space in the first level for a master bedroom, originally located in the Ground floor , fully equipped with private bathroom and wardrobe.

Through a glazing  door you have access to a large outdoor terrace paved with IPE wood. The original main load-bearing wall, located in the center of the house, was treated with a special plaster  roughly finished. All the furniture and FF&E are custom made and designed by us

Villa al mare a Fregene - Scala
Villa al mare a Fregene - Soggiorno e sala da pianzo
Villa al mare a Fregene - Tavolo da pranzo
Villa al mare a Fregene - Dettaglio
Villa al mare a Fregene - Tavolo da pranzo
Villa al mare a Fregene - Dettaglio scala

Similar projects

+

Beach Club La Manga

Building, Interior Design

Load more

Municipio di Las Torres de Cotillas - La piazza
18 February /

Las Torres de Cotillas City Hall

Las Torres de Cotillas City hall

Offices, commercial areas and a public square

Buildings, Competitions

Details_

 

  • CLIENT: Ayuntamiento de Las Torres de Cotillas, Murcia (Spa)
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 10.000 sqm
  • BUDGET: 8.500.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed
  • Photografer: © David Frutos

Project description_

 

With the intent to meet the new needs related to the rapid population growth occurred in the City of Las Torres de Cotillas, in 2004, the City has organized an international competition for the new City Hall. The building should have replaced the existing one, almost obsolete and unable to accommodate the new functional requirements of the City, and it would group all departments that they were dispersed across remote sites.

Our design intention, clear since the initial phase,  was to create a building that was not monumental even if placed around a big square, as commonly it occurs for a City Hall building. Not a monument but a symbol of participation and transparency of the Municipality towards the citizen.

Inspired by the above aim, we divided in two areas the city hall’s functions: all the department and offices strictly considered “private” were organized into a glazed building set at the level 0.00  . Therefore, public functions as main entrance,  lobby, civil registry , the council chamber, town planning technical office, were set at a lower level -4.00, directly connected with the main square located at the same level.

Our decision to move the square in a lower level was due to the desire to create a public space that was protected from the traffic flows, and at the same time, our aim was to recreate the typical town square on which functions as cafe’ restaurant retails moreover the municipality were usually placed. A square with the values of the past: a place to stay, to live every day, a place where they could also take place events and shows.

A real public square that was not representative of the government, instead of the relation between citizen. Around the public square an artificial landscape and topography composed by ramps and slope is generated.

Municipio di Las Torres de Cotillas
Municipio di Las Torres de Cotillas - La piazza
Municipio di Las Torres de Cotillas - La piazza
Municipio di Las Torres de Cotillas - La piazza
Municipio di Las Torres de Cotillas - La piazza
Municipio di Las Torres de Cotillas - La piazza

Under the aforementioned artificial path, functions related to the administration department are displaced. The glazed facade system is characterized by a serigraphy with  semi opaque “bubble” shaped.  supported by a parametric software we define size ,shape and density of each “bubble” in order to obtain the best performance of the facade, based on objective and measurable data

Municipio di Las Torres de Cotillas - Dettaglio facciata
Municipio di Las Torres de Cotillas - Vista notturna
Municipio di Las Torres de Cotillas - Ingresso
Municipio di Las Torres de Cotillas - La scala principale
Municipio di Las Torres de Cotillas - Vista sull'ingresso
Municipio di Las Torres de Cotillas - Sala confernze
Municipio di Las Torres de Cotillas - Sala confernze
Municipio di Las Torres de Cotillas - Uffici
Municipio di Las Torres de Cotillas
Municipio di Las Torres de Cotillas - Ufficip del sindaco
Municipio di Las Torres de Cotillas - Uffici
Municipio di Las Torres de Cotillas - Ufficio tipo

Similar projects

Load more