Archives!



Uffici e Centro Logistico Detectalia
21 March /

DetectaliaTm’s Office and Logistic center

Detectalia Europe

Office and logistic center

Buildings

Details_

 

  • CLIENT: Detectalia Europe s.l.u.
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 900mq
  • BUDGET: 400.000€
  • PHASES: Preliminary and final design, tender drawings | Site supervision | Completed
  • Photografer: ©AdHocMsl

Project description_

 

The new Detectalia Europe‘s headquarters involves the construction of a building containing the offices and storages located in a  plot inside of an industrial estate in Alicante, Spain. Client’s request was to have building stands out from all other buildings within the industrial area. A Landmark , and icon capable to activate new business for the company.

Uffici e centro logistico Detectalia Europe

Our deign intention was to realize an industrial building that visually would break with the typical image of the surroundings and that would different from the  classical shed appeal usually based on pitched roof and facade dichotomy. A building that, thanks to its small size, it was more like a symbolic object to a real building itself. It would have been like a stone set in the ground similar to the characteristic rocky and barren land of the surrounding landscape.

Uffici e Centro Logistico Detectalia - Vista esterna
Uffici e centro logistico Detectalia Europe
Uffici e centro logistico Detectalia Europe

Because of the limited budget, we designed something feasible within economical constrains , avoiding any difficult or complicated solution, tiring to semplify the use of material and details.For this reason it was decided to start to work by using simple elements and of easy realization: a classic metal steel structure with pillars and pitched roof, clad with insulated aluminum panels covered in yellow polyurea on the top side and lacquered white on the bottom.

In collaboration with the engineering firm Maffeis Engineering S.p.A. and using a parametric modeling software we modified the trilithic structure in order to achieve the best balance between plastic form and dimensional and mechanical optimization of aforementioned structures.

Uffici e Centro Logistico Detectalia - Cantiere
Uffici e sede di Detectalia

The coating is intended to be a skin , which modify and change the concept of being an edge. The roof becomes a facade, and the facade within its tridimensional shape becomes a roof. The main building entrance, identified by a portal made of black metal sheet, is placed in the north side near to the industrial area’s main entrance. In the main lobby there is  a reception area with a well coming area, that connects the exhibition space in the ground floor.  The area dedicated to the  open-space offices on the first floor are connected by a steel custom made staircase.

Our research was not only focused on formal aspects, therefore we strongly believe in the need to design a landmark that would be ecologic and feasible at the same time. For that purpose in order to use spaces at best and to improve the energy efficiency of these, we decrease  the high in the office areas ( 6.00 m) and increase the one in the warehouse ( 9.00 m) favoring and exploiting the formless shapes of building .

Uffici e Centro Logistico Detectalia - Ingresso
Uffici e Centro Logistico Detectalia - Uffici
Uffici e centro logistico Detectalia Europe
Uffici e Centro Logistico Detectalia - Uffici
Uffici e centro logistico Detectalia Europe

Similar projects

Load more

Auditorium e Centro d'Arte
4 March /

Concert Hall and Art Center

AyCA – Concert Hall and Art Center

Auditorium's audience 800 people, exhibition area and offices

Interiors Design

Details_

 

  • CLIENT: Ayuntamiento de Las Torres de Cotillas
  • PROJECT: Riccardo Crespi Architetto
  • AREA: 7.500mq
  • BUDGET: 9.000.000€
  • PHASES: Competition

Project description_

 

The site on which will be built the new Auditorium and Art Centre (Ayça) of Las Torres de Cotillas is part of the complex of the Shopping and Business Center Los Carmenes, that occupy the northwest corner of the aforementioned plot.

During the preliminary studies we soon realized that budget and the maximum buildable area were both insufficient to achieve the required program as: auditorium with 800 seats, the dressing rooms ancillary spaces, rehearsal rooms, back of house and the underground car park of 4,000 square meters.

Auditorium e Centro d'Arte
Auditorium e Centro d'Arte
Auditorium e Centro d'Arte

To overcome this obvious deficiency  we has decided to provide in addition to the new auditorium and art center, a feasible management program  related to all those areas left empty and abandoned : the idea was to activate a complex that could be used 12 month per year actively related with all the future activities and events, with the aim to support budget’s deficiencies.

Moreover our main design intent was simplify the construction system to avoid economic waste, but at the same time the aim was to provide a simple building but extremely functional. The project’ heart is an hard-scape square dedicated  to outdoor events – exhibitions , Sunday markets, that becomes an indoor space entering in the mail large foyer. The Lobby is covered by a lightweight flexible and modular roof, and surrounded by a openable glazed facade that create a space that could be indoor either outdoor as well in which exhibition halls, small concert halls, conference rooms are displaced.

It is an extremely flexible space and transformed according to the different needs of the sliding through acoustic panels.

Auditorium e Centro d'Arte - Tavola del concorso
Auditorium e Centro d'Arte - Tavola del concorso
Auditorium e Centro d'Arte - Tavola del concorso

Similar projects

+

Beach Club La Manga

Building, Interior Design

Load more

3 March /

School for Sustainable Energies

School for Sustainable Energies

Classroom, laboratories, conference hall and offices

Competition

Details_

 

  • CLIENT: Ciudad de Murcia
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl)
  • AREA: 6.2000mq
  • BUDGET: 8.700.000€
  • PHASES: Competition

Project description_

 

The typical geometry of the Huerta of Murcia – the area planted with orchards medium / small size typical of the surroundings of the city, whose top view geometry comprises a particular and distinctive “mosaic” – the research of  the three-dimensional slipped shape– already applied other competitions as the Ciudad de la Justicia or the new Gulf Hospital – inspired us in the designing process for Renewable energy Training Centre.

Centro Formazione per Energie Rinnovabili - Modello
Centro Formazione per Energie Rinnovabili - Modello
Centro Formazione per Energie Rinnovabili

One of the main goal for this project, as well as the use of renewable energy sources Extreme – solar, photovoltaic and wind – that could allow the full recovery of the building, was to be able to develop a project that occupy less than 50% of the available plot, obviously for the same energy-saving targets.To achieve aforementioned  purpose we decided to developed a building that had a structure and a form such as to minimize the points of contact with the ground. A building that had to be thought of as a and that the feet of this bridge was nothing but volumes containing the offices, laboratory, auxiliary function as per the brief’s request.

It is thus a functional layering – from bottom to top: laboratories, classrooms and directional area – consisted in  “slipped modules” that generate a building characterized by the alternation of volumes and voids. Voids conceived and designed as green courtyards.

Centro Formazione per Energie Rinnovabili
Centro Formazione per Energie Rinnovabili - Piano primo

Similar projects

Load more

Centro commerciale e Business Center Los Carmenes - Vista aerea
3 March /

Shopping e Business Center Los Carmenes

Shopping and Business Center Los Carmenes

5 buildings for office, Shopping Mall, Hotel, Housing, Hospital and Nursery

Competition

Details_

 

  • CLIENT: Eora
  • PROJECT: Riccardo Crespi Architetto (AdHocMsl) + Modostudio
  • AREA: 110.000sqm
  • BUDGET: 150.000.000€
  • PHASES: Preliminary and final design, tender drawings

 Project description_

 

In 2011, with the Mall and Business Center Los Carmenes 4.0 revision,  the analysis phase related to the development and strategic revision of the aforementioned shopping mall have been completed. It was concluded with the victory of the international competition held by Eora Company.Of the original project, despite the many changes made to meet client’s request, it has preserved the clear identification of functional areas, their permeability, the urbanity goals and eco-efficiency and the  research of architectural value.

Centro commerciale e Business Center Los Carmenes
Centro commerciale e Business Center Los Carmenes

General Layout

The great heterogeneity of required mixed-used functions (shopping  mall, a Business Center, small buildings for artisans, 4-star hotel, apartment-hotel, one small health care building and kindergarten ) instead of being ” problem of cohabitation ” has become on the contrary an occasion of mutual enrichment thanks to close relations and dynamics are formed.From the triangular shape of the lot, it was decided to define each side with its own specific functional character. The west side groups the tertiary functions – called Mixed Zone – the north side is dedicated to the “quick” business and trade and the south side -est locates the most representative features of the mixed-use Complex.

Due to the aforementioned functional layout, the Complex is easily accessible however always preserving and separating the service flow from the public one.Automatic flow are located and segregated along the perimeter of the plot only, where the underground public entrances are displaced. From the parking area  the circuit of pedestrian path have origin and connects a series of public spaces and square located on a different level. Squares and path generate a sophisticated circuit of connection , protected and highly designed. It is a artificial landscape, space for the community and for its activities.

Centro commerciale e Business Center Los Carmenes - Ingresso principale Mall
Centro commerciale e Business Center Los Carmenes - Superfici medie
Centro commerciale e Business Center Los Carmenes - Piazza superiore
Centro commerciale e Business Center Los Carmenes - Interno Mall

Retail and Shopping-mall

The shopping-mall is around 42.300 smq divided in two areas 21.00 smq each. Even if it represents the majority of the buildable area, our strategy is to minimize the volumetric impact and to realize a mall that is perfectly integrated  with the landscape, within a sort of camouflage approach that could create a eco-natural complex integrated within the neighborhood. Accordingly we designed A 5 m high building , characterized by a 250 m long facade  covered with and artificial metal roof treated as a landscape.

Centro commerciale e Business Center Los Carmenes - Modello
Centro commerciale e Business Center Los Carmenes - Modello

Business Center

Apart from the Shopping mall, it represent the second crucial part of the project, in terms of size and functions. It spreads over a total area of 45,300 square meters, of which 27,400 of offices and shopping areas and 17,900 square meters of underground parking on several levels.Completely surrounded by nature, it is accessed by car from the west side through a private road however pedestrians can access from the main front in the south.

One volume of 4.300 mq – containing the entrance hall, a conference center, offices , retails and anchors-   is the basement on which they rest four office buildings of 6 and 8 floors – totaling 15,400 square meters with the addition, as a final and symbolic characteristic element for the entire complex, a 7,700 sq m tower for offices and distributed on 22 plans. To make the space flexible and  to allow the panoramic views from inside, we chose the Core typology. Accordingly a central core contains the staircase-lift block and toilet. The corridor is around the perimeter of the core and it distributes the various offices.

Centro commerciale e Business Center Los Carmenes - Business Center
Centro commerciale e Business Center Los Carmenes - Business Center

Mixed-use zone

In this area, mainly on the west side, are placed a 4-star hotel of 5,000 sqm on six floors, a 4,000 sqm healthcare building to on 8 storey, a 2,000 sqm apartment hotel related to the Business and few small buildings  550 sqm each for small and medium-sized craft business  for a total of about 5,000 sqm.There is also a 900sqm Kindergarten , intentionally located in the center of the plot, to be easily accessible by all employees but above all to be completely immersed in nature

Eco-efficiency and Sustainibily

Energy efficiency and its sustainability appears to be of the utmost importance, so much so that the commission was intended that Los Carmenes was the first Shopping and Business Center to obtain LEED Gold certification.

The first pursued goal was the optimization of energy demanded, minimizing what is referred to as energy backpack, that is, the amount of energy used for the construction of buildings.In this direction it goes the choice to adapt as much as possible the buildings to the topography of the land apparently burying the Shopping-Mall of the service areas.Direct sun exposure to the west is completely canceled as a result bringing considerable energy savings required for cooling of the shopping mall itself. Other energy-saving passive systems are the skins of the buildings, designed as a double façade formed of a metal outer link and an inner glass facade.

Centro commerciale e Business Center Los Carmenes - Modello
Centro commerciale e Business Center Los Carmenes
Centro commerciale e Business Center Los Carmenes - Pianta
Centro commerciale e Business Center Los Carmenes - Aree Funzionali
Centro commerciale e Business Center Los Carmenes - Aree Verdi
Centro commerciale e Business Center Los Carmenes - Il sistema dei percorsi

Active systems on the other hand are made from large metal cover that covers the shopping center, which not only acts as a shading function of the underlying spaces but on which you will install the solar panels, and the recycling and purification is rainwater.

Similar projects

+

Beach Club La Manga

Building, Interior Design

Load more